The Archibald consists of 2 towers with common podium, 28 storey high rises with roof and 1 basement level,167 hotel rooms, 289 residential apartments, Ground floor Pub + Hotel Lobby + Retail, Hotel foyer at Level 01, and a striking 960 m2 sky bar.
Gateway Parramatta consists of a 42 storey high rise mixed use tower, 22 storey residential tower, 10 storey hotel, swimming pool, gym, car showroom, retail, pedestrian bridge, and 5 storey car parking basement under a common podium connecting the 3 buildings.
Prime at 101 Waterloo Road Macquarie Park consists of 680 apartments & 15 retail shops with common podium and 2 basements. It consists of 4 blocks of buildings – 22 storeys each with one of the buildings supported on an iconic tripod at podium. Services provided: Structural Engineering from Concept to Completion, Site supervision and inspections.
Grand Central Towers is a high residential apartment development including 360 residential apartments located in twin 25 storey towers. It also features a large, and landscaped ground floor podium and public domain works.
Building A, B, C at 52 O’dea Ave Waterloo is part of a 350 apartment development with common podium and 3 basements.
Vivacity Stage 2 is a mixed-use precinct including 583 residential apartments over six towers up to 30 storeys in height. It also features a large, and landscaped ground floor podium, swimming pool, seven storey commercial tower and retail areas.